In this project, we are the general contractor, with responsibility for coordination of civil works and mechanical and electrical systems.
Building A2 and A3 HVAC, plumbing, and fire protection system for fine office and residential buildings in downtown Milan.
The works in question involved the construction and plant upgrading of the basement floor and some specific rooms of the U-POWER STADIUM (Brianteo Stadium of A.C. Monza) and more specifically:
Redevelopment works of the building for tourist-receptive use, consisting of an "L" shaped building body with six above-ground floors
Building renovation of Building located in Milan Via Marco d'Aviano for office use of 6 floors including building works for internal layout remake
Redevelopment Building for residential use used as a women's boarding house located in Monza Centro, "turnkey" including the construction
Mechanical systems of the 7,500-square-meter shopping mall arranged on 12 floors in the heart of Milan, various types of systems to meet the needs of individual tenants, considering different uses, clientele and opening hours.
Quality, sustainability and comfort the watchwords in the redevelopment of the building owned by Alleanza Toro: mechanical and electrical systems for the LEED-certified building.
Redevelopment of the building at piazzale Marconi 25 in Rome: construction of the mechanical systems serving the 19 above-ground floors of the building built in 1960 to a design by architect Luigi Mattioni.
Construction of mechanical and fire protection systems of the office building owned by the Unicredit group in Cologno Monzese.
Realization of mechanical and electrical systems for the Room Mate Giulia design boutique hotel in Milan's historic 19th-century building at 4 Via Silvio Pellico, the first LEED Silver-certified hotel in Milan.
Mechanical and fire-fighting systems for the 80,000 sq. m. of commercial space in La Spezia's "Le Terrazze" center and the 45,000 sq. m. of accompanying parking lots.
Implementation of mechanical, fire protection, and electrical systems of the Ikea store in Corsico.
Construction of Mechanical, HVAC, Utilities and Fire Protection Systems new production building B34 in the pharmaceutical hub of Bari.
Revamping production department of spray and aerosol dispensing devices produced in clean room (ISO 7 and ISO 8) and intended for the pharma market
Implementation of fire protection system for new industrial settlement R3 of STMicroelectronics Plant in Agrate Brianza.
Construction of HVAC system serving No. 2 clean rooms where production activities are carried out, at the Olgiate Olona Plant.
Realization of new mechanical, process and fire-fighting systems at the Star plant in Agrate, of the well-known Spanish GBFoods group.
Construction of thermal, refrigeration, fire-fighting and electrical systems for the expansion of the production spaces of the Barilla plant in Rubbiano di Solignano.
HVAC systems for summer and winter air conditioning for the departments and production lines of the Cermenate production facility
Construction of mechanical, HVAC, fire protection and C-class areas for the new production areas and laboratories of the pharmaceutical company in Sesto Fiorentino.
Mechanical, firefighting, clean steam and medical gas systems for the Nerviano pharmaceutical hub.
Mechanical, fire and process systems serving the production departments, clean rooms, warehouses and offices of the new production facility
Various interventions on the buildings of the Bosco Marengo industrial complex for the necessary extensions and adaptations to the facilities
Necessary expansions and adaptations to facilities for new production needs: process plants, solvent plants, hvac, heating and cooling, and firefighting systems.
Construction of sprinkler system and water reserve at Piedimonte San Germano intermodal multimodal logistics center, 25,000 m2 warehouse directly connected to FCA plant
Adding {{itemName}} to cart
Added {{itemName}} to cart